Company history · Since 2012

Company History

A company direction shaped by custom cable assembly, overmolding and the engineering questions behind repeat production.

Our development follows the requirements customers bring

The company has grown around the practical connection between cable construction, connector molding, tooling and production control.

What we grew around

Custom assembly
Supporting non-standard lengths, pinouts, branches, terminals, protection and identification.
Overmold and tooling
Bringing molded connector geometry and cable construction into one engineering workflow — 3,000+ tooling sets built since 2012.
Global project support
Helping overseas OEM buyers move from drawing or sample review to prototype and repeat supply.

Timeline

YearMilestone
2012Company founded in Longgang, Shenzhen
Today4 production lines, 3,000+ tooling sets built since 2012, 1,000,000 pcs annual capacity, quality system certified to ISO 9001

We publish milestones when they are documented rather than estimated. Additional dated milestones — first in-house tool, first overseas OEM program, facility changes — will be added as the records are confirmed.

What has not changed

Three things have stayed constant since the first custom enquiry: engineering questions are answered before the quote rather than after the first article; the tooling is ours, so a change is a decision rather than a negotiation; and what we cannot do is stated at the start.

That last one is the reason this page has a short timeline instead of a long one.

What has changed since 2012

The milestones on this page are dated only when they are documented, which is why the timeline is short. What has changed is easier to describe as capability than as dates.

  • Custom went from exception to default. Non-standard lengths, pinouts, branches, terminals, protection and identification are now the normal request rather than the difficult one.
  • Tooling came in-house. Molded connector geometry and cable construction moved into one engineering workflow. 3,000+ tooling sets have been built since 2012.
  • Overseas became the main audience. Most programs now start as a drawing or a sample from an overseas OEM buyer and end in repeat supply.
  • Verification moved earlier. Test scope is agreed at quotation, which is the only point where agreeing it is free.

Everything we build — cable assemblies, wire harnesses and overmolded connectors — came out of that sequence. The capacity figures on the facility page — four production lines, 3,000+ tooling sets built since 2012, 1,000,000 pcs a year, 32–12 AWG — are the current state, and we will send the current numbers with a quote rather than ask you to trust a number printed on a web page.

Company history FAQ

When was the company founded?

2012, in Longgang, Shenzhen — inside the Pearl River Delta component supply chain, with same-day access to connector, cable and molding material suppliers.

How many tooling sets have you built in-house?

More than 3,000 built since 2012, covering low-pressure overmold tools, insert molds, vertical injection tools and sealing tools. They are designed, cut and maintained in our own mold shop.

Why is the timeline on this page so short?

We publish a milestone when it is documented rather than estimated. Additional dated milestones — first in-house tool, first overseas OEM program, facility changes — will be added as the records are confirmed.

What has stayed the same?

Three things: engineering questions are answered before the quote rather than after the first article; the tooling is ours, so a design change is a decision rather than a renegotiation; and the person who quoted the job is still there when it repeats.

See how that experience supports a current project.

Bring the drawing, the sample or the failure you are trying to stop repeating — or start with the facility and judge the capability for yourself.

Discuss a Requirement